SAVIN 9033 DRIVER

On the number pad enter 1 0 7 4. When the drum surface is touched or becomes dirty, wipe it with a dry cloth or clean it with wet cotton. Assemble the PCU and install it in the machine. Tap 2 or 3 times at each location, to make the toner fall into the development section. The total rotation time is 30 seconds. Turn the development roller gear [I] to remove toner from around the development roller. Make sure that the holes for the screws on the front and rear end of the PCU are aligned correctly.

Uploader: Mezijar
Date Added: 23 October 2011
File Size: 19.6 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 45182
Price: Free* [*Free Regsitration Required]

Separate the top and bottom parts of the PCU. Release the front tab [C].

Savin – Copiers and Printers Shipping Quote

Leave a Reply Cancel reply You must be logged in svin post a comment. Therefore, I recommend installing the new drum unit in the machine right before you put savin 9033 two halves back together. If you replaced 90333 components: Make sure that the holes for the screws on the front and rear end of the PCU are aligned correctly. Before you get stressed out by savin 9033 at the long list of directions below, look at the illustration in the middle of the page.

Replace the drum [E] White clip savin 9033 [F].

Remove the rear screws [B] x2. The total rotation time is 30 seconds.

Attach the front frame pawls and front and rear [A]. Tighten the top screw [F].

savin 9033 SavinCleaning Blade Replacement 1. On the savin 9033 pad enter 1 0 7 4. Make sure that the head of the stud is put in the correct position. SavinDeveloper Replacement 1. Tighten the three screws and coupling [D].

Product Center

Remove the front screw [A] x1 5. Make 5 sample copies. You must be logged in to post a savin 9033.

Assemble the development unit. Then push down to lock the tabs on the front and rear end of the PCU. Remove the roller assembly [D] Springs x2, Arms x2, Rollers x2 6. savin 9033

Remove the front stud [A]. Set the bottom on the vinyl sheet. Continue to rotate the black gear until the developer is level. Remove the rear cover [B] x3, Coupling x1. Turn savin 9033 the main power switch. Hold the eavin [A] by its sides, pull it down and savin 9033 twist it away from the PCU. Separate the top [E] and savin 9033 [F] of the development unit. Install the PCU in the machine.

SAVIN – Northeastern Office Equipment

Turn on the main power savin 9033, and close the front door. Photoconductor Savin 9033 PCU 1. Remove the front cover [A] x2. Turn the development roller gear [I] to remove toner from around the development roller. See Note 933 Bold Green above.